ArcGIS REST Services Directory Login | Get Token
JSON

Legend (pro_feature_edit)

Bushfire Observations - Point (18)
Air strip Air strip
Aerial Ignition - Completed Aerial Ignition - Completed
Aerial Ignition - Planned Aerial Ignition - Planned
Asset Asset
Base camp Base camp
Control / Operations point Control / Operations point
Division Extremity (East-West) Division Extremity (East-West)
Division Extremity (NW-SE) Division Extremity (NW-SE)
Division Extremity (North-South) Division Extremity (North-South)
Division Extremity (SW-NE) Division Extremity (SW-NE)
Fire Origin Confirmed Fire Origin Confirmed
Helipad Helipad
Hot spot within the burn area Hot spot within the burn area
Point of interest Point of interest
Indigenous Site Indigenous Site
Hazard Hazard
Hazardous Tree Hazardous Tree
Hazardous Point Asbestos Hazardous Point Asbestos
Hazardous Point Mine Shaft Hazardous Point Mine Shaft
Point of origin Point of origin
Sector Extremity (East-West) Sector Extremity (East-West)
Sector Extremity (NW-SE) Sector Extremity (NW-SE)
Sector Extremity (North-South) Sector Extremity (North-South)
Sector Extremity (SW-NE) Sector Extremity (SW-NE)
Spot fire outside of the burnt area Spot fire outside of the burnt area
Predicted Spot Fire Predicted Spot Fire
Staging area / marshalling point Staging area / marshalling point
Traffic management point Traffic management point
Utility Utility
Water point Water point
Water point - helicopter access Water point - helicopter access
Water point - vehicle access Water point - vehicle access
Radio - Repeater Radio - Repeater
Radio - MORF Trailer Radio - MORF Trailer
Bushfire Observations - Line (19)
Backburn - completed Backburn - completed
Backburn - planned Backburn - planned
Evacuation / escape route Evacuation / escape route
Fire control line - completed Fire control line - completed
Fire control line - planned Fire control line - planned
Fire edge active Fire edge active
Fire edge contained Fire edge contained
Machine cut track Machine cut track
Wet Line Wet Line
Hand Trail Planned Hand Trail Planned
Hand Trail Completed Hand Trail Completed
Fallback Line Planned Fallback Line Planned
Fallback Line Completed Fallback Line Completed
Strategic Break Planned Strategic Break Planned
Strategic Break Completed Strategic Break Completed
Containment Line Primary Containment Line Primary
General Line General Line
Sector Line Sector Line
Division Line Division Line
Bushfire Observations - Area (20)
Current Burnt Area Current Burnt Area
Flood Observations - Point (21)
Tree Down Tree Down
Storm affected property Storm affected property
Storm damaged other Storm damaged other
Landslide Landslide
Levee breach Levee breach
Dam Failure Dam Failure
Road closure Road closure
Traffic Management Traffic Management
Traffic Management - Planned Traffic Management - Planned
Air strip Air strip
Asset Asset
Base camp Base camp
Flood Flood
Flood Front - Predicted Flood Front - Predicted
Flood Front - Past Flood Front - Past
Flood affected livestock – confirmed Flood affected livestock – confirmed
Flood affected livestock – unconfirmed Flood affected livestock – unconfirmed
Flood affected property - confirmed Flood affected property - confirmed
Flood affected property - unconfirmed Flood affected property - unconfirmed
Flood rescue boat - unconfirmed Flood rescue boat - unconfirmed
Operations point Operations point
Point of interest Point of interest
General point General point
Over topping Over topping
Flood Observations - Line (22)
Evacuation Route Evacuation Route
Flood Peak Contour Flood Peak Contour
Line Of Interest Line Of Interest
Temporary Levee Temporary Levee
Flood Observations - Area (23)
Area Of Interest Area Of Interest
Control Area Control Area
Declaration Area Declaration Area
Emergency Alert Warning Area Emergency Alert Warning Area
Evacuation Area Evacuation Area
Flash Flood Flash Flood
Storm Surge Storm Surge
Flooded Area - Confirmed Flooded Area - Confirmed
Flooded Area - Predicted or Unconfirmed Flooded Area - Predicted or Unconfirmed
Hazardous Area Hazardous Area
Previously Inundated Area Previously Inundated Area
Emergency Stabilisation (44)
A - CPD - Trees Assessed A - CPD - Trees Assessed
A - CPD - Trees Complete A - CPD - Trees Complete
A - CPD - Trees Not Assessed A - CPD - Trees Not Assessed
A - Impacted Area - To Be Assessed A - Impacted Area - To Be Assessed
B - Hazardous Trees - Assessed B - Hazardous Trees - Assessed
B - Hazardous Trees - Complete B - Hazardous Trees - Complete
B - Hazardous Trees - In Progress B - Hazardous Trees - In Progress
B - Hazardous Trees - Not Assessed B - Hazardous Trees - Not Assessed
C - Breach and Bar C - Breach and Bar
C - Emergency Stabilisation - Assessed C - Emergency Stabilisation - Assessed
C - Emergency Stabilisation - In Progress C - Emergency Stabilisation - In Progress
C - Emergency Stabilisation - Not Assessed C - Emergency Stabilisation - Not Assessed
C - Emergency Stabilisation - Complete C - Emergency Stabilisation - Complete
C - Excavator Required C - Excavator Required
C - Grader Required C - Grader Required
C - No Surface Work Required C - No Surface Work Required
C - Rehab Required - Close Track C - Rehab Required - Close Track
C - Rehab Required - Keep Open C - Rehab Required - Keep Open
D - Ready for Approval D - Ready for Approval
D - Open D - Open
E - Ready for VicRoads sign off E - Ready for VicRoads sign off
E - Open E - Open